Dear experts,
I'm running a climate simulation for over 40 years using MPAS V8.2. However, after running for several days, the time output becomes irregular (as shown in picture).
I began my simulation on 1978-01-01, but after 1995-01-06, the time output becomes abnormal. And if i began on 1978-01-05, the time after 1995-01-10 also becomes abnormal.

I'm running a climate simulation for over 40 years using MPAS V8.2. However, after running for several days, the time output becomes irregular (as shown in picture).
I began my simulation on 1978-01-01, but after 1995-01-06, the time output becomes abnormal. And if i began on 1978-01-05, the time after 1995-01-10 also becomes abnormal.