Hello,
I plan to run RCP (4 & 8) simulations with MPAS and therefore need to allow the model to spin up to the imposed SST. I plan on running the model for a year as Spin-Up. Do you think that is long enough/too long for the model to reach equilibrium?
Also, during the Spin-Up, I plan to remove as many variables as possible to save on cost. Are there any immutable variables in the streamlists that are necessary for the model to run (i.e., xCell, zVertex, etc.)? Or can I run the model for a year without producing any variables?
Thanks as always,
Zach
I plan to run RCP (4 & 8) simulations with MPAS and therefore need to allow the model to spin up to the imposed SST. I plan on running the model for a year as Spin-Up. Do you think that is long enough/too long for the model to reach equilibrium?
Also, during the Spin-Up, I plan to remove as many variables as possible to save on cost. Are there any immutable variables in the streamlists that are necessary for the model to run (i.e., xCell, zVertex, etc.)? Or can I run the model for a year without producing any variables?
Thanks as always,
Zach