Hi, I am trying to use vortex-following with three domains. Domain 1 is the parent, and domains 2 and 3 are moving nests.
But, the run always stops with the following timing.
Grid 2 New SW corner (in parent x and y): 123 84
Timing for main: time 2011-08-26_19:27:00 on domain 1: 9.52316 elapsed seconds
The start time is 2011-08-24 00UTC, and the end is 2011-09-06 00UTC.
Could you tell me why the vortex-following stopped?
Thank you.
Mori Mori
But, the run always stops with the following timing.
Grid 2 New SW corner (in parent x and y): 123 84
Timing for main: time 2011-08-26_19:27:00 on domain 1: 9.52316 elapsed seconds
The start time is 2011-08-24 00UTC, and the end is 2011-09-06 00UTC.
Could you tell me why the vortex-following stopped?
Thank you.
Mori Mori