Jayanti pal
Member
Sir,
Being a mesoscale model WRF model has to integrate <=72 hours. I would like to run a climate simulation using WRF.
Can I do that ? if yes then how?
Being a mesoscale model WRF model has to integrate <=72 hours. I would like to run a climate simulation using WRF.
Can I do that ? if yes then how?