Hi, WRF forum!
I am a WRF beginner. From what I understand so far, I can only produce results /simulations for just the same timeframe as the forcing dataset ( and selected in the namelist.input & namelist.wps). Assuming I do not want to force with future projection datasets like the Bias corrected CMIP5 CESM data for WRF, is there a way to obtain future runs from the current WRF run?
I am a WRF beginner. From what I understand so far, I can only produce results /simulations for just the same timeframe as the forcing dataset ( and selected in the namelist.input & namelist.wps). Assuming I do not want to force with future projection datasets like the Bias corrected CMIP5 CESM data for WRF, is there a way to obtain future runs from the current WRF run?