Hi
I am running a two-way nested simulation for quite a large area (see namelist.wps attached) and for quite a long simulation (1980-2014). I am now to run metgrid.exe and am curious as to whether there will be any value running metgrid.exe in parallel with mpirun. I hope someone can provide me with some thoughts.
I am running a two-way nested simulation for quite a large area (see namelist.wps attached) and for quite a long simulation (1980-2014). I am now to run metgrid.exe and am curious as to whether there will be any value running metgrid.exe in parallel with mpirun. I hope someone can provide me with some thoughts.