Running metgrid with mpirun for a long simulation?

Selu_93

New member
Hi

I am running a two-way nested simulation for quite a large area (see namelist.wps attached) and for quite a long simulation (1980-2014). I am now to run metgrid.exe and am curious as to whether there will be any value running metgrid.exe in parallel with mpirun. I hope someone can provide me with some thoughts.
 

Attachments

metgrid usually runs very quickly. with the grid numbers shown below, I don't think it is necessary to run metgrid in parallel mode.

e_we = 226,626,
e_sn = 147,366
 